In early 2011, Berard
begun planning the daunting task of transporting
this 375,000 pound boiler over 600 miles from
Pryor, Oklahoma to Krotz Springs, Louisiana. After
several months of preparation, Berard coordinated
a turn-key effort to receive the boiler from its
original operating pad, transport 30 miles over
Oklahoma state roads using dual lane DOTD approved
equipment, transfer onto a deck barge for transport
to Louisiana, offload the cargo via roll-off on
the banks of the torrent Atchafalaya River, transport
2 miles using self propelled modular transporter
to the refinery, and jack down on its final pad.
The entire lifting and transport operation was
executed safely in less than three weeks. |
|

Click image for more photos |
|
|
| |
| |
Project
Type: Transformer
Transport
Location: Sterlington,
LA
Weight: 674,000
lbs
Job
Details:
Berard recently transported
this colossal 674,000 pound transformer over 300
miles from the Port of New Orleans, LA to an electrical
substation in Sterlington, LA. Berard prepared
a deck barge to receive the cargo from ship cranes,
and provided barging service to Sterlington. Upon
arrival, Berard prepared the Ouachita River bank
for the roll-off operation. The Goldhofer PST-ESE
transporters, which are the only ones operated
in the United States, proved to be the premier
equipment for transport over the steep levee crossing.
Minimal site preparation was needed for the transporters
to climb the 10% grade, as well as to make the
sharp 130 degree turn onto the one mile route
over public roads to the destination. |
|

Click image for more photos |
|
|
| |
| |
Project
Type: Transformer
Move
Location: Little Rock,
AR
Weight: 175
Job
Details:
Berard was contracted
to move three of these 175 ton transformers from
the Port of Little Rock to a power plant. The
move spanned 15 miles of steep upgrades and downgrades
and was accomplished using three 12 axle line
spmt transporters. |
|

Click image for more photos
|
|
|
| |
|
Project
Type: Switchgear Building
Location: New Orleans,
LA
Weight: 220
Tons
Job
Details:
The loadout
site for this move had only one access road to
it, this is where Berard's 10' wide transporters
were perfect for the task. A detailed ramp &
ballast plan was designed by Berard engineers
to accomplish the move due to the shallow water
level at the site. The move was completed successfully
in only one day. |
|