Berard Home > Project Gallery > Offshore
Project Type: Offshore Deck
Location:
Gibson, LA
Weight: 2600 Tons

Job Details:
Loading and offloading offshore platforms is just about an everyday occurrance at Berard. This one however was just a little different. During one of the recent hurricanes this deck weighing 2600 tons developed a “minor” fire. Once removed from it’s foundation offshore and transported to the clients facility in Gibson Louisiana, the Berard Team took action to make this final part of the move a safe and successful one. Using ninety-six lines of SLES and ESEs transporters powered by eight power pack units, the deck was offloaded from a 300' x 100' x 20' deck barge to the clients facility.

Click image for more photos
 
Project Type: Offshore Living Quarters
Location:
Abbeville, LA
Weight: 650 Tons

Job Details:
This was definitely not your average, ordinary move, it was a challenge that Berard seems to love to take on. The Manson project was a unique loadout that proved once again why Berard is at the top of the list when it comes to mega transport. The job consisted of loading out this 110’ x 40’ 650 ton living quarters onto a barge at the fabricators yard in Abbeville, LA, then towed to Amelia, LA.
Here’s where it gets interesting. The derrick barge the living quarters was to go on was too deep to ballast down at the builders facility or owners facility, so the game plan consisted of utilizing a drydock to lift the barge and living quarters together to raise the load to the same deck height of the derrick barge so it could be trans-loaded using 22 lines of PST-ESE transporters. Once on the derrick barge, the load then was towed to Houma, LA, and using eight 135 ton climbing jacks controlled by a unified jacking system, the load was lowered onto the deck of the barge, finalizing another successful job.

Click image for more photos
 
Project Type: Offshore Deck
Location:
Amelia, LA
Weight: 450 Tons

Job Details:
In our business, moving an offshore deck is an everyday occurrence. Sure, we’ve moved decks much larger and heavier but what makes this one so special is that it had to be raised an additional 12’. The deck was first transported in the yard and then lifted to the 12’ needed for the additional legs. The now higher deck was then loaded out onto a waiting barge for delivery in the Gulf of Mexico.

Click image for more photos
 
Project Type: Offshore Deck
Location:
Amelia, LA
Weight: 350 Tons

Job Details:
Using 24 lines of ESEs, 4 ppus, numerous stands,
blocks and shimming material to transport this 350 ton 4 pile deck was the task at hand. The deck was moved out of shop to stab the main deck onto the existing cellar deck. This was done with the clients overhead cranes together with a 275 ton crawler crane. The SPMTs manuvervability was crucial to the aligning of the deck as it had to be within mere millimeters. The deck was then elevated to a new height of 8’-3” and transported out of the shop and into the laydown yard to allow the deck to sit on taller legs due to changes in offshore height regulations. The ESEs stroke of 27” allowed the Berard Team to do this in a timely and safe
manner. The project was accomplished in only 1.5
days and within budget.
 
Click image for more photos
 
Project Type: Offshore Compressor
Location:
Delcambre, LA
Weight: 900 Tons

Job Details:
This job was a challenge due to the shallow water slip the barge was docked in. The barge height was 5' above the bulkhead so Berard engineers went to work designing and building a ramp system to move the 900 ton compressor onto the barge. Using 40 axle lines of Goldholfer transporters, the move was successfully completed on time and in a safe manner in only one day.

Click image for more photos
 
Project Type: Offshore Living Quarters
Location:
Houma, LA
Weight: 1375 Tons

Job Details:
This offshore living quarters was rotated 90 degrees, then moved over 400 yards to an awaiting barge. Berard overcame tight working conditions requiring various steering modes. The project was completed in one day.

Click image for more photos
 
Project Type: Offshore Deck
Location:
Houma, LA
Weight: 650 Tons

Job Details:
Poor ground conditions were to be had on this six leg deck. Berard handled it with the use of matting to assure proper traction and load support.
 
Click image for more photos
 
Project Type: Offshore Deck
Location:
New Iberia, LA
Weight: 1245, 750 & 402 Tons

Job Details:
Berard completed a project that required to load-out a 1245-short ton DSM 1 module using 54 axle lines, a 750-short ton DES module using 28 axle lines, and a 402-short ton DSM 2 module using 28 axle lines.  All modules were loaded out on the same barge.  The project required expertise in transporters, project management and ballasting.

Click image for more photos
 
Project Type: Offshore Deck
Location:
Houma, LA
Weight: 850 Tons

Job Details:
Thirty-four axle lines of SPMT's were used to make this move a success. Another typical loadout done right by Berard.

Click image for more photos
 
Project Type: Offshore Deck
Location:
New Iberia, LA
Weight: 750 Tons

Job Details:
The center of gravity was far offset, requiring proper planning and careful operation. Berard worked closely with project planners for the safe loadout of the deck. Berard made the cover and a three page article in Structural Mover Magazine.

Read about it here: Structural Mover - Berard Article

Click image for more photos
 
Project Type: Offshore Deck
Location:
Houma, LA
Weight: 850 Tons

Job Details:
Poor ground conditions were no problem for Berard when it came to this loadout. The job was completed in only one day, fulfilling the clients timeline.
 
Click image for more photos
 
Project Type: Offshore Deck
Location:
New Iberia, LA
Weight: 200 Tons

Job Details:
One of our smaller moves, this four pile offshore platform was transported using a three file system, ensuring proper support of the high center of gravity load.

Click image for more photos
 
Project Type: Offshore Jacket
Location:
New Iberia, LA
Weight: 1150 Tons

Job Details:
Coming in at 300' x 113', this offshore jacket was no problem for Berard. The jacket was offloaded from a barge onto the yard for storage and refurbishment. When the refurbish was completed, Berard was called on to do the loadout.

Click image for more photos
 
Project Type: Offshore Deck
Location:
Houma, LA
Weight: 1000 Tons

Job Details:
The loadout of this 1000 ton deck was not your ordinary loadout. Due to the soft conditions of the south Louisiana soil, steel plates had to be laid along the travel areas to ensure proper support under the load.

Click image for more photos
   
Berard Home > Project Gallery > Offshore
 


Powered By

Graphic Details Digital Media